top of page
Onsite Featured Project #1
Synergy was brought into this project to modify the tank. The customers existing tank required additional volume. To increase the volume, 12" was added to the tank which included moving the tanks structural supports.
Due to the customers time restraints and lack of manpower Synergy was also hired to provide additional onsite assistance.
Onsite System Assembly
· mechanical
· assembly work
· electrical
· plumbing
project scope
Onsite Featured Project 1
Onsite assembly at customers facility
Onsite Featured Project 2
Refurbished filter installed onto the modified tank.
Onsite Featured Project 3
Reworked fluid piping with refurbished pumps.
Onsite Featured Project 4
Refurbished tank with structural supports.
Onsite Featured Project 5
This views shows a new control panel which required new wiring.
Onsite Featured Project 6
Reworked air lines and fluid piping.
bottom of page